• Amphitheater for outdoor performances
• Veteran’s memorial & flag lawn to honor our heroes
• Memorial walk to connect us to the history of the site and the town
• Fire pit area for cold-weather celebrations
• Multiple seating areas and flexible gathering spaces to maximize appeal and usage
• Park-like atmosphere with native trees and plantings for year-round aesthetic
• Added parking for downtown businesses.
From the Project Manager - January 8, 2026: The site has been graded/prepped to rough subgrade. About 75% of the existing foundation demo has been completed. The earthwork sub will finish foundation demo next week. Underground utility materials (Manholes and water/sewer/storm pipe) to be installed before the end of January. Longer lead items like the band shell have also been ordered.
R&R Taylor Construction, Inc., Bozeman, MT, has been selected as the general contractor for Sheepherder Square Phase 2 construction.
Construction on Phase 2 started on December 8, 2025, and will finish in the fall of 2026. Check our Facebook and Instagram pages for photos and updates.
We have raised $1.6M towards the $2M needed for this phase of the project. Phase 2 includes splash pad, turf, bandshell and all plantings.
Future phases will include the amenities building and restrooms and other amenities and features as funding allows.
Sheepherder Square Foundation is a non-profit 501(c)(3) organization.